A Northeast India bike trip has become far more practical in the last few years: the Sela Tunnel to Tawang opened in March 2024, the National Highways and Infrastructure Development Corporation (NHIDCL) has seven packages of the Arunachal Frontier Highway (NH-913) under way worth about ₹4,922 crore, and Arunachal's Inner Line Permit is now issued online. Riders looking past a crowded Ladakh are heading to Sikkim, Arunachal, Meghalaya and Nagaland. The trade-off is fragile terrain: landslides, long monsoons and events like the October 2023 Teesta flood can cut roads for months.
- Sela Tunnel (March 2024, ₹825 crore) takes about 90 minutes off the Tezpur-Tawang run.
- NH-913: seven Frontier Highway packages, 259.55 km, about ₹4,922 crore.
- eILP: Arunachal's Inner Line Permit now takes minutes online; Sikkim's restricted areas are still largely offline.
- 13 bridges were destroyed by the October 2023 Teesta flood: plans here are provisional.
- 60 to 160 km is a hill day in a published Tawang bike itinerary.
I grew up in Jalpaiguri in North Bengal, at the foot of these hills. In November 2025 I rode from Bengaluru to East Sikkim and back, up past Kupup to Baba Mandir at about 4,120 m and down from Zuluk to Cooch Behar.
So this is not a brochure. It is an argument that the Northeast is the most interesting touring region in India right now, and that it needs riders who travel differently from the Ladakh rush.
On 28 June 2026, after days of monsoon rain, a motorcyclist was crossing a narrow, mud-covered stretch of road cut into the hillside at Siji in Lower Siang district, Arunachal Pradesh. The rain had already eaten into the slope. As he moved forward it gave way, and earth and rocks carried him and his motorcycle down the hill; the debris ran on into the Siji river.
He escaped without injury, and the video of it spread on X. The same spell of rain set off a bigger landslide at the Siji–Magi block point that dammed the river itself, and the district administration told people on both banks to move to safer places in case the debris gave way in a flash flood.
Business Today: Biker swept away by landslide on Lower Siang road
What is changing on Northeast roads?
The biggest change is infrastructure built for strategic reasons that also opens the region to riders. Three projects matter most.
- Sela Tunnel. Opened on 9 March 2024 at a cost of ₹825 crore, with two tunnels of 1,003 m and 1,595 m under the 13,700 ft Sela massif. It takes about 90 minutes off the Tezpur-Tawang run and keeps the road open when the pass is snowed in.
- A second road to Tawang. In December 2025 the Sela-Chabrela-BJ Gompa road was opened as an alternative axis to Tawang, because the existing road north of the Sela ridge is vulnerable.
- The Frontier Highway (NH-913). A new road along Arunachal's northern border. NHIDCL's status page lists seven NH-913 packages totalling 259.55 km and about ₹4,922 crore, five of them under construction.
See the data as a table
| Length (km) | |
|---|---|
| Hunli-Hayuliang Pkg III | 61.5 |
| Hunli-Hayuliang Pkg I | 53 |
| Tato-Monigong | 53.04 |
| Kharsang-Miao-Vijaynagar Pkg 1 | 35.58 |
| Kharsang-Miao-Vijaynagar Pkg 4 | 25.97 |
| Hunli-Ithun Bridge | 17.38 |
| Tuting-Zido | 13.08 |
Source: NHIDCL: Current status of projects, Arunachal Pradesh · Seven packages, 259.55 km in all, total project cost about ₹4,922 crore. Tuting-Zido and Vijaynagar Pkg 4 were awarded but not yet started.
| NH-913 package | Length | Project cost | Status |
|---|---|---|---|
| Hunli-Hayuliang, Package III | 61.50 km | ₹1,418.67 crore | Ongoing |
| Hunli-Hayuliang, Package I | 53.00 km | ₹1,262.43 crore | Ongoing |
| Tato-Monigong | 53.04 km | ₹625.61 crore | Ongoing |
| Kharsang-Miao-Gandhigram-Vijaynagar spur, Package 1 | 35.58 km | ₹202.58 crore | Ongoing |
| Kharsang-Miao-Gandhigram-Vijaynagar spur, Package 4 | 25.97 km | ₹820.53 crore | Awarded |
| Hunli-Ithun Bridge | 17.38 km | ₹275.50 crore | Ongoing |
| Tuting-Zido | 13.08 km | ₹316.44 crore | Awarded |
Look at the cost per kilometre: the Hunli-Hayuliang packages (₹1,262.43 crore over 53 km and ₹1,418.67 crore over 61.5 km) run above ₹23 crore per km, a measure of how hard it is to cut a road through this terrain.
When these sections join up, places like Anini, Hayuliang, Vijaynagar and Tuting, which today mean long detours and broken tracks, will sit on a continuous highway. Riders will follow.

Are permits still a barrier in the Northeast?
Less than they were, but you still need to plan for them. Four northeastern states use the Inner Line Permit (ILP), a system that goes back to the Bengal Eastern Frontier Regulation of 1873, and Sikkim has its own permits for its border areas.
Foreign nationals need a Protected Area Permit for many of the same places.
| State | Permit for Indian visitors | Notes |
|---|---|---|
| Arunachal Pradesh | Inner Line Permit | Applied for online on the state's eILP portal (version 3.0 rolled out statewide from November 2022); tourist permits valid 15 days, extendable |
| Nagaland | Inner Line Permit | Fee of ₹200 for Indians and ₹300 for foreign tourists |
| Mizoram | Inner Line Permit | Temporary permit for 15 days, extendable by 15; available at Lengpui airport for air arrivals |
| Manipur | Inner Line Permit | Extended to Manipur on 11 December 2019 |
| Sikkim | Permits for restricted areas such as North Sikkim | Issued in Gangtok or at district offices; riders need ID, photos, the bike's RC and insurance |
| Assam, Meghalaya, Tripura | No ILP | Not part of the ILP system |
The practical change is that permits now take minutes online for Arunachal rather than a day in an office.
The Tripoto post linked above, written by a traveller who rode to Gurudongmar, describes the older way: queueing at the Gangtok office in a narrow morning window, or getting the permit more easily at the Mangan district office. Sikkim's restricted-area process is still largely offline.
I keep the current steps in the Sikkim bike trip permits guide and the Tawang bike trip and ILP guide, and the long history of the system is in the history of the Inner Line Permit.
Why are riders turning from Ladakh to the Northeast?
Because Ladakh has become crowded and the Northeast offers what Ladakh used to: empty roads, unfamiliar food and languages, and the sense of arriving somewhere few riders have been.
Leh alone recorded 2,35,698 tourist arrivals in 2016, up from 8,068 in 2002, and the queues at its passes are now part of the trip. I set out those numbers in are bikers loving Ladakh to death?
The Northeast also offers something Ladakh never could: variety in a single trip. In one ride you can go from the paddy terraces of Ziro to the high passes of Tawang, from the Dooars tea country to the old silk route in East Sikkim.
On my 2025 ride, the descent from Zuluk at about 2,750 m to Cooch Behar at about 46 m went through Lava and the Dooars; it gets its own post in the Zuluk to Cooch Behar descent.



What makes Northeast roads riskier than they look?
Rain and unstable slopes. The mountains here are steep, the monsoon is long and wet, and roads are cut into hillsides that slide. The most dramatic recent example came in October 2023, on the Teesta valley route that every rider to North Sikkim uses.
An international team of more than 30 researchers reconstructed the disaster. On 3 October 2023, about 14.7 million m³ of frozen lateral moraine collapsed into South Lhonak Lake, raising a wave about 20 m high that breached the moraine dam and drained about 50 million m³ of water. The flood eroded about 270 million m³ of sediment and overwhelmed hydropower installations down the Teesta. Limit: the reconstruction relies on satellite data and modelling for an event nobody measured directly.
Read the abstract (free)A second study traces the flood to a landslide that dumped about 38.31 million m³ of debris into the lake, along with about 7 million m³ of glacier ice lost by calving, which together collapsed the left lateral moraine. The flood killed 24 people, left more than 70 missing, destroyed 13 bridges and a major hydropower plant near Chungthang, and affected over 60,000 people across four districts. Limit: the two studies differ on the triggering volume, a reminder of how hard such events are to reconstruct.
Read the paper (free)Chungthang is not an abstract place to me; I have ridden Kolkata to Gangtok and on to Chungthang. Thirteen bridges is the number a touring rider should remember.
A route that was open in September can be gone in October, and rebuilding in this terrain takes seasons, not weeks.
Treat every northeastern plan as provisional until you have checked the road on the day.Sapta

When is the best time for a Northeast India bike trip?

After the monsoon has eased, and before deep winter shuts the highest passes. The monsoon brings the landslides that close roads like the Teesta corridor, so avoid the heart of it.
My own East Sikkim ride was in November 2025, and I still met ice on the visor near Baba Mandir, so pack for cold even in a dry month. My solo Northeast motorcycle route goes into the season windows in more detail, and monsoon onset dates for riders has the data.
Will the Northeast go the way of Ladakh?
It could, and riders will have helped. The same forces that drove Ladakh's numbers up, better roads, easier permits and social media, are now pointed at Tawang, Ziro and Zuluk.
| Ladakh | Northeast | |
|---|---|---|
| Where tourists go | Funnelled through one town and two lakes | Spread across eight states and dozens of routes |
| The pressure point | Crowds and queues at the passes | Small, close communities with distinct cultures, and villages without the waste and water systems to absorb a sudden wave |

Riders can be the best kind of visitor here, or the worst:
- The best kind stays in homestays, eats local food, spends money in the villages it passes, travels slowly and leaves nothing behind.
- The worst kind treats Sela like Khardung La: a photo, a queue and back down the same day.
The roads are being built either way. How we use them is ours to decide.
How should a first-timer approach the Northeast on a bike?
- Start with Sikkim or Meghalaya. Shorter distances, good food and easy permits make them gentler introductions than Arunachal.
- Get permits early. Apply for Arunachal's eILP online before you leave, and know where the Sikkim permit offices are.
- Plan short days. A published Tawang bike itinerary has hill days of 60 to 160 km. Ride in daylight only.
- Carry spares and tools. Workshops that know bigger touring bikes can be far apart once you leave the plains.
- Think about altitude and fuel. A carburetted bike loses power with height, as mine did at Gurudongmar; plan fuel stops with the reduced mileage in mind.
- Respect local rules. Some areas restrict photography near military installations, and village customs vary. Ask first.
The Northeast is where my KTM goes next, and when I ride it I will write it up properly. Until then, the touring world lives on the Yatri page, and the gear I ride with is on the gear page.
What's new
- Tawang gets an alternative road axis via Sela-Chabrela-BJ Gompa The Tribune, Dec 2025
- New study reconstructs the sequence behind the 2023 South Lhonak flood Scientific Reports, Mar 2026
- NHIDCL project status for NH-913 and other Arunachal highways NHIDCL, 2026
Questions people ask
Do I need a permit for a Northeast India bike trip?
For Arunachal Pradesh, Nagaland, Mizoram and Manipur, Indian visitors need an Inner Line Permit; Arunachal's is issued online. Sikkim needs permits for restricted areas such as North Sikkim. Assam, Meghalaya and Tripura need none.
Is it safe to ride solo in the Northeast?
Yes, with planning. The main risks are landslides, weather and long gaps between fuel stations and workshops, not people. Ride in daylight, check road status each morning and keep a buffer day in the plan.
How many days do you need for a Northeast bike trip?
There is no fixed answer, but with hill days of 60 to 160 km, as in the itinerary linked above, I would allow at least a week for one state, such as Sikkim or a Tawang loop from Guwahati, and three weeks or more for a multi-state loop, plus buffer days for weather.
What is the Frontier Highway in Arunachal Pradesh?
NH-913, a new highway along Arunachal's northern border. NHIDCL lists seven packages of 259.55 km worth about ₹4,922 crore, mostly under construction as of 2026.
Is the Sela Tunnel open to tourists?
Yes. It opened in March 2024 and carries regular traffic to Tawang, cutting the Tezpur-Tawang journey by about 90 minutes.
Sources
- NHIDCL: Current status of projects in Arunachal Pradesh (2026)
- The Tribune: Crucial twin-lane Sela tunnel connecting Tawang opens (2024)
- The Tribune: Tawang gets alternative road axis (2025)
- Government of Arunachal Pradesh: eILP portal (2026)
- Wikipedia: Inner Line Permit (states, fees, validity, with state government references) (2026)
- Sattar A. et al.: The Sikkim flood of October 2023, Science 387 (2025)
- Mohanty L.K. et al.: Sequence of events that led to the South Lhonak lake outburst flood, Scientific Reports (2026)
- Tripoto: Is Ladakh becoming too crowded? (Gurudongmar permits and route) (2018)
- District Statistical Handbook Leh 2016-17: tourist arrivals (2018)
- Wikipedia: Sela Tunnel (2026)
- Business Today: Arunachal Pradesh landslide video, biker swept away on Lower Siang road (June 2026; source for the story)