Longest road tunnels in India, ranked by length (2026)

Chenani-Nashri still holds the title by 260 m, the Mumbai-Pune Missing Link just slipped into third, and Zojila will beat them all in 2028.

The south portal of Atal Tunnel under the Rohtang Pass in Himachal Pradesh
Photo: Jagseer S Sidhu, CC BY-SA 4.0, via Wikimedia Commons

The longest road tunnel open in India in 2026 is the Chenani-Nashri tunnel on NH 44 in Jammu and Kashmir, at 9.28 km, opened on 2 April 2017. Atal Tunnel under the Rohtang Pass is second at 9.02 km, and the main tunnel of the Mumbai-Pune Expressway Missing Link, opened on 1 May 2026 at about 8.9 km, is third. The Zojila tunnel, which broke through in June 2026, will take the top spot at 13.15 km when it is commissioned, scheduled for February 2028.

Key takeaways
  • Chenani-Nashri (9.28 km, April 2017) is India's longest road tunnel in service, 260 m longer than Atal.
  • Atal Tunnel (9.02 km, about 3,000 m) cut Manali to Keylong from 116 km to 71 km.
  • The Missing Link tunnel (about 8.9 km, May 2026) is third, but bikes are barred from it.
  • Zojila (13.15 km) broke through in June 2026 and will top the list from February 2028.
  • At the portal your eyes go briefly blind: lift a dark visor and slow down before you enter.

India built more mountain road tunnel in the last decade than in the whole century before it, and most of it sits on routes riders care about: Jammu to Srinagar, Manali to Lahaul, Srinagar to Ladakh, Guwahati to Tawang.

This list ranks road tunnels strictly by bore length, using the official or project figure for each. Where a project has twin tubes of slightly different length I use the longer tube. For each tunnel I also mark:

  • what it replaced;
  • its altitude;
  • the one question riders always ask: can I take a motorcycle through?
9.28 kmChenani-Nashri, India's longest road tunnel in service
13.15 kmZojila, longest once commissioned (target Feb 2028)
~3,000 maltitude of Atal Tunnel, the highest of the long ones
3 h to 15 minZoji La crossing time once the tunnel opens
Longest road tunnels in India, open and under construction
See the data as a table
Length (km)
Zojila (under construction)13.15
Chenani-Nashri9.28
Atal9.02
Missing Link tunnel 28.87
Banihal-Qazigund8.45
Sonamarg (Z-Morh)6.5
Silkyara Bend-Barkot (under construction)4.531
Shinku La (under construction)4.1
Missing Link tunnel 11.68
Sela tunnel 21.595

Source: News On AIR (Zojila, Jun 2026), The Tribune (Sela, Mar 2024), project records summarised on Wikipedia · Missing Link tunnels per tube; other reports give 8.92 km and 1.6 km.

Rank (open)TunnelLength (km)OpenedMotorcycles
1Chenani-Nashri (Dr Syama Prasad Mookerjee)9.282 Apr 2017Yes
2Atal Tunnel, Rohtang9.023 Oct 2020Yes
3Missing Link tunnel 28.87 to 8.921 May 2026No (expressway)
4Banihal-Qazigund8.454 Aug 2021Yes
5Sonamarg (Z-Morh)6.513 Jan 2025Yes
6Jawahar Tunnelabout 2.851956Old route
7Missing Link tunnel 11.6 to 1.681 May 2026No (expressway)
8Sela tunnel 21.5959 Mar 2024Yes
9Bhatan tunnelabout 1.092002No (expressway)
10Sela tunnel 11.0039 Mar 2024Yes
TunnelHighway / stateAltitude
Chenani-NashriNH 44, J&Kup to 1,200 m
Atal Tunnel, RohtangManali-Keylong, HP3,000 to 3,100 m
Missing Link tunnel 2Mumbai-Pune Expressway, MaharashtraSahyadri crest
Banihal-QazigundNH 44, J&Kabout 1,790 m
Sonamarg (Z-Morh)NH 1, J&K2,637 m
Jawahar TunnelOld Jammu-Srinagar road2,194 m
Missing Link tunnel 1Mumbai-Pune ExpresswaySahyadri crest
Sela tunnel 2NH 13, Arunachalbelow Sela (4,170 m)
Bhatan tunnelMumbai-Pune ExpresswayWestern Ghats
Sela tunnel 1NH 13, Arunachalbelow Sela

1. Chenani-Nashri tunnel, 9.28 km

The Chenani-Nashri tunnel, officially the Dr Syama Prasad Mookerjee tunnel, is India's longest road tunnel in service at 9.28 km, on NH 44 between Udhampur and Ramban. It opened on 2 April 2017 after work began in July 2011, at a final cost of about ₹3,720 crore against an original ₹2,520 crore.

It cut about 30 km and two hours from the Jammu-Srinagar trip by bypassing a snow and landslide-prone climb, and it tops out at about 1,200 m.

How the tunnel is built

Its engineering is unusual for India:

  • a 13 m main tube with a separate 6 m escape tube alongside;
  • 29 cross-passages linking the two, about every 300 m;
  • a transverse ventilation system with fresh-air inlets every 8 m, the first of its kind in an Indian road tunnel.
Plan view (not to scale)Main tube, 13 mEscape tube, 6 mCross-passage about every 300 m (29 in all)Dots: fresh-air inlets, about every 8 m (transverse ventilation)In a fire, you walk through a cross-passageinto the clean-air escape tube
Chenani-Nashri in plan: two tubes, not one. The escape tube and the cross-passages are the safety idea that later Himalayan tunnels copied.
Lit portal of the Chenani-Nashri highway tunnel on NH 44 at night
The Chenani-Nashri tunnel at night. Its escape tube and cross-passages every 300 m set the safety template for later Himalayan tunnels.Photo: Sidheeq, CC BY-SA 4.0, via Wikimedia Commons

2. Atal Tunnel, 9.02 km under the Rohtang

Atal Tunnel is 9.02 km long under the Rohtang Pass at about 3,000 to 3,100 m, and it is described as the longest single-tube highway tunnel above 10,000 ft in the world. Drilling started at the south portal on 28 June 2010, and the Prime Minister opened it on 3 October 2020 at a cost of about ₹3,200 crore, against a 2000 estimate of ₹500 crore.

The route from Manali to Keylong fell from 116 km to 71 km and from five or six hours to about two.

The story

The hardest 526 m of Atal Tunnel took about four years. Drilling began at the south portal in June 2010, and the heading soon ran into the Seri Nalla fault zone. The rock there was sheared and weathered, mostly river-borne material, and water poured in at up to 127 litres a second; in June 2012 alone the inflow reached about 30 lakh litres a day.

Speaking to Construction World, project manager Sunil Tyagi said that short stretch took around four years to excavate, with the face needing constant dewatering. Once the heading cleared the zone, progress jumped, reaching 217 m in a single month. Both ends of the tunnel met on 13 October 2017, and the tunnel opened on 3 October 2020.

Construction World: Tunnel reduces travel time by five hours, interview with project manager Sunil Tyagi
The face of the tunnel "used to flow like a river of mud and boulders."Construction World, on the Seri Nalla zone of Atal Tunnel

For riders, Atal Tunnel changed the Manali-Leh ride. Rohtang is no longer the first wall of the trip, which means you now reach Lahaul in about two hours from Manali, a faster gain in altitude that matters for acclimatisation. The wider effect of the new tunnels on Himalayan road trips is in the tunnels essay, and the old road's story is in the Manali-Leh highway history.

The longer of the two Missing Link tunnels is about 8.9 km (8.87 km per tube in one record, 8.92 km in others), part of a 13.3 km, ₹6,695 crore bypass that opened on 1 May 2026 and takes Mumbai-Pune Expressway traffic around the 19.8 km Khandala ghat. It runs up to about 180 m below the surface, under Lonavala lake, with a bore about 22.3 m wide.

It is the only tunnel in the top five that motorcycles cannot use, because two-wheelers are barred from the expressway. Two months after opening, landslides in heavy rain on 6 July 2026 forced a temporary closure of the Mumbai-bound carriageway. The ghat it bypasses is covered in the Bhor Ghat history.

  • Length: about 8.9 km
  • Opened: 1 May 2026
  • Motorcycles: not allowed

4. Banihal-Qazigund tunnel, 8.45 km

The Banihal-Qazigund road tunnel is 8.45 km long under the Pir Panjal on NH 44 and opened on 4 August 2021 at about ₹2,100 crore (Wikipedia). It crosses at about 1,790 m, roughly 400 m lower than the old Jawahar Tunnel at 2,194 m, which matters in winter because snow and avalanches used to close the higher bore for weeks.

It shortened Banihal to Qazigund by 16 km and the Jammu-Srinagar trip by about half an hour. Together with Chenani-Nashri, it means a rider on NH 44 now spends about 18 km of the Jammu-Srinagar run inside mountains.

Calculated in this post from the 9.28 km Chenani-Nashri and 8.45 km Banihal-Qazigund lengths (9.28 + 8.45 = 17.73 km).

  • Length: 8.45 km
  • Altitude: about 1,790 m
  • Replaced: Jawahar Tunnel route (2,194 m)
Portal of the Banihal-Qazigund road tunnel on NH 44 in Jammu and Kashmir
The Banihal-Qazigund tunnel portal. It runs about 400 m lower than the 1956 Jawahar Tunnel it replaced.Photo: Mir207, CC BY-SA 4.0, via Wikimedia Commons

5. Sonamarg (Z-Morh) tunnel, 6.5 km

The Sonamarg tunnel, also called Z-Morh, is 6.5 km long at 2,637 m on NH 1 from Srinagar towards Ladakh, opened on 13 January 2025. Work began in May 2015, stalled in 2018 over contractor finances and restarted in July 2020; the approach roads add about 6 km in all. It keeps Sonamarg reachable in winter by bypassing an avalanche-prone stretch of the Sindh valley, and it is the first half of the all-weather Srinagar-Leh plan. The second half is Zojila.

  • Length: 6.5 km
  • Altitude: 2,637 m
  • Opened: 13 January 2025

6 to 10. The shorter tunnels riders actually meet

Below 6.5 km the list drops sharply.

  • Jawahar Tunnel (1956): about 2.85 km, and for 65 years the only road under the Pir Panjal.
  • Sela tunnels, NH 13, Arunachal: 1,595 m and 1,003 m long, opened on 9 March 2024 at ₹825 crore. They handle about 3,000 cars and 2,000 trucks a day, have an 80 km/h limit and save almost 90 minutes on the Tezpur-Tawang run by bypassing the snow on Sela, which rises to 13,700 ft (The Tribune, 2024).
  • Expressway tunnels of 2002: Bhatan, at about 1.05 to 1.09 km per tube, is the longest. They are closed to bikes like the rest of the expressway.
The portal of the Sela tunnel on the road to Tawang in Arunachal Pradesh
The Sela tunnel on NH 13. At 1.6 km it is short, but it keeps Tawang open through the winter.Photo: Nskjnv, CC BY 4.0, via Wikimedia Commons

Which tunnels are under construction, and when will they open?

Three long road tunnels under construction matter to riders, and Zojila will change the whole ranking.

Zojila

The Zojila tunnel on NH 1 between Baltal and Minamarg achieved its final breakthrough on 9 June 2026. At 13.15 km, plus nearly 18 km of approach roads, at about 11,578 ft, it will be Asia's longest bi-directional road tunnel. It will cut the Zoji La crossing from over three hours to about 15 minutes, with commissioning planned for February 2028.

Silkyara, Shinku La and Khardung La

TunnelLengthStatusWhat it does
Silkyara Bend-Barkot, Uttarakhand4.531 kmBroke through April 2025Char Dham road plan; saves about an hour
Shinku La, Lahaul-Zanskar4.1 km, twin tubeStarted 26 July 2024; about half bored by May 2026; target August 2028All-weather road to Zanskar
Khardung La5.5 kmProject report finished; waiting for fundingLeh to Nubra

The Silkyara breakthrough came 17 months after the 12 November 2023 collapse that trapped 41 workers, all rescued after a 17-day operation.

The unpaved road over Zoji La pass with steep mountainsides and snow
The Zoji La road today. The 13.15 km tunnel beneath it will turn a three-hour crossing into a 15-minute one. Its history is in the Srinagar-Leh highway post.Photo: VinayakPhadatare, CC BY-SA 4.0, via Wikimedia Commons

What is it like to ride through a long tunnel?

Riding a long tunnel is mostly about your eyes and your mirrors. At the portal, bright daylight gives way to a much dimmer tube, and for a moment your eyes cannot see into the dark; lighting engineers call it the black hole effect, and it is why tunnel lighting is brightest at the entrance.

Inside, the noise of trucks echoing off the walls hides what is behind you, and a dark visor makes everything worse. On my 2025 Sikkim ride the Teesta corridor included a tunnel, a reminder that this is not only a Himalayan-highway problem. The two studies below explain why the entrance is hard on the eyes and what helps.

Light level a rider's eyes face (schematic)daylightthresholdtransitioninteriorportallit tunnel: steps downgently, eyes keep upunlit drop: the black hole effectLift a dark visor before the portal, not inside it.
Why the first seconds are blind: outside light is far brighter than any tunnel, so engineers put the most light at the entrance and step it down. Without that, the drop at the portal outruns your eyes.
The Impact of LED Color Rendering on the Dark Adaptation of Human Eyes at Tunnel EntrancesZhao E. Z., Dong L. L., Chen Y., Lou Q., Xu W. H. · International Journal of Environmental Research and Public Health 17(5): 1566 · 2020

A laboratory simulation of the moment a driver enters a tunnel, testing four colour-rendering levels (CRI2012), three colour temperatures and eight target colours to see how quickly people could react to an object while their eyes were still adapting to the dark. Yellow, silver and white targets gave the shortest reaction times; red and brown the longest. Target colour mattered more than the light's colour rendering, though better rendering shortened reactions for most colours. The authors recommend entrance LEDs with colour rendering close to 100 and a colour temperature around 2,800 K. Limit: a lab study with simulated scenes, not on-road crash data. For riders the practical lesson is to wear yellow or white and to assume a dark helmet and jacket are close to invisible in the first seconds of a tunnel.

Read the paper (free)
Lighting Environment Optimization of Highway Tunnel Entrance Based on Simulation ResearchZhang Y., Zhuo X., Guo W., Wang X., Zhao Z. · International Journal of Environmental Research and Public Health 16(12): 2195 · 2019

The team measured natural light inside and outside the entrance of a highway tunnel in Zhejiang across seasons and weather, then used DIALux lighting simulation to model how illumination falls with distance into the tunnel. They found glare from bright surroundings combined with too little light inside made the entrance the hardest zone for drivers' eyes. Their fixes are a shading shed over the approach, auxiliary lighting, speed-reducing reflective markings and adaptive dimming that tracks outside brightness. Limit: one tunnel and a simulation model, with no before-and-after crash counts.

Read the paper (free)
  1. Lift or swap a dark visor before the portal. Do it at the last lay-by, not while riding into the dark.
  2. Slow down 100 m before entry. You are blind for the first second or two; give yourself room.
  3. Ride with your headlight on and wear something bright. The lab results above favour yellow, white and silver.
  4. Hold a steady line and do not stop inside. Atal Tunnel is a single tube carrying traffic in both directions, so there is no shoulder to pull onto.
  5. Expect different weather at the exit. Atal's north portal opens into Lahaul, on the far side of the Pir Panjal from Manali.

Most of these tunnels were built by the Border Roads Organisation or under it; its story is in the BRO history. For the Ride Atlas overview, see Yatri.

Questions people ask

Which is the longest road tunnel in India in 2026?

Chenani-Nashri on NH 44 in Jammu and Kashmir, at 9.28 km, open since April 2017. Atal Tunnel is 260 m shorter at 9.02 km.

Will Zojila be the longest tunnel in India?

Yes, among road tunnels. At 13.15 km it will be about 3.9 km longer than Chenani-Nashri and is described as Asia's longest bi-directional road tunnel. Commissioning is planned for February 2028.

Calculated in this post from the 13.15 km Zojila length and the 9.28 km Chenani-Nashri length (13.15 - 9.28 = 3.87 km).

Can I ride a motorcycle through Atal Tunnel?

Yes. Atal Tunnel is on the Manali-Keylong road and carries all normal traffic, including motorcycles. Riders cannot use the Mumbai-Pune Missing Link tunnels, because two-wheelers are barred from that expressway.

Ladakh via Srinagar or Manali: which route has more tunnels?

From the Jammu side, Chenani-Nashri, Banihal-Qazigund and the Sonamarg tunnel are all open, and Zojila will follow in 2028. From Manali, Atal Tunnel is open and Shinku La is under construction for the Zanskar route. The route choice itself is covered in Ladakh via Manali or Srinagar.

Sources

  1. News On AIR: Zoji-La tunnel achieves final breakthrough (2026)
  2. Wikipedia: Chenani-Nashri Tunnel (accessed 2026)
  3. Wikipedia: Atal Tunnel (accessed 2026)
  4. Wikipedia: Banihal Qazigund Road Tunnel (accessed 2026)
  5. Wikipedia: Z-Morh (Sonamarg) Tunnel (accessed 2026)
  6. The Tribune: Crucial twin-lane Sela tunnel connecting Tawang opens (2024)
  7. Wikipedia: Mumbai-Pune Expressway (tunnels and Missing Link) (accessed 2026)
  8. Autocar India: Maharashtra CM inaugurates the Missing Link (2026)
  9. News Arena India: Missing Link finally opens (2026)
  10. Wikipedia: Shinku La (tunnel status) (accessed 2026)
  11. Wikipedia: Khardung La (planned tunnel) (accessed 2026)
  12. The Tribune: After 2023 setback, Silkyara tunnel breakthrough achieved (2025)
  13. Zhao et al.: LED colour rendering and dark adaptation at tunnel entrances, IJERPH (2020)
  14. Zhang et al.: Lighting environment optimization of highway tunnel entrance, IJERPH (2019)
  15. Construction World: Atal Tunnel, interview with project manager Sunil Tyagi (Seri Nalla zone: 526 m, about four years, 127 litres a second; source for the story)
Chenani-Nashri tunnelAtal TunnelZojila tunnelBanihal-QazigundSonamarg tunnelSela tunnelMissing Link
Sapta

Sapta (Saptarshi Sarkar) is a mechanical engineer turned marketer in Bengaluru and a solo touring rider. He writes the seven Saptaverse blogs. Work with him or read more of RoadHook Rides.