The history of Indian Railways begins on 16 April 1853, when the Great Indian Peninsula Railway ran a 14-carriage train with about 400 passengers from Bori Bunder in Bombay to Thane, roughly 34 km, on a day declared a public holiday. Private British companies built the early network under a guarantee of about 5% a year on their capital; the state took the lines over, merged 42 railway systems after Independence and regrouped them into six zones by 1952. Later milestones include electric traction (1925), the Rajdhani (1969), computerised reservations (1986), Vande Bharat (2019) and 99.6% broad-gauge electrification by March 2026.
- 16 April 1853: 14 carriages and about 400 passengers ran from Bori Bunder to Thane, about 34 km.
- Early lines were built by private companies under a 5% guarantee paid from Indian revenues if earnings fell short.
- Rail access raised real farm income by about 16% in the average district it reached (Donaldson, 2018).
- 42 railway systems were merged after 1947 and regrouped into six zones by 1952.
- Electrified route km went from 388 in 1950-51 to 69,873 (99.6% of broad gauge) by March 2026.
Indian Railways is now one of the largest railway systems on earth. A Press Information Bureau backgrounder of April 2026 counts:
- about 25,000 trains a day;
- 741 crore passenger journeys in 2025–26;
- a record 1,670 million tonnes of freight in the same year.
This post lays out the dated history behind that scale, why the lines were built where they were, and what the research says the railways actually did to India's economy.
When did the first train run in India?
The first passenger train in India ran on 16 April 1853 from Bori Bunder (Bombay) to Thane, and the government's own account of the day reads like a festival.
Bombay treated 16 April 1853 as a public holiday so that its people could watch. Large crowds gathered at Bori Bunder station. About 400 passengers climbed into 14 carriages of the Great Indian Peninsula Railway, a company only four years old. A 21-gun salute marked the departure, and the steam locomotive, which the government's 2026 history names as Falkland, pulled the train out towards Thane.
The run covered about 34–35 km. Nothing about it was commercially remarkable: one short suburban line, one train, a few hundred guests. What it proved was that a railway could work in Indian conditions, and within three decades the network had grown to about 9,000 miles. Every number later in this post, from 741 crore passengers to 99.6% electrification, traces back to that holiday afternoon.
Press Information Bureau: From Steam to Speed, the Ever-Evolving Journey of Railways (April 2026)One detail is disputed. The PIB account names the locomotive as Falkland; many popular retellings instead say three engines named Sahib, Sultan and Sindh hauled the train, and sources do not agree.
The 1853 run is the date India celebrates as the birth of its railways, and PIB's 2026 backgrounder counts "173 years" from it. Bori Bunder's site is now part of Chhatrapati Shivaji Maharaj Terminus (formerly Victoria Terminus), the Gothic station building that UNESCO inscribed as a World Heritage Site in 2004.
It is one of four railway World Heritage listings in India:
- Darjeeling Himalayan Railway (1999);
- Chhatrapati Shivaji Maharaj Terminus (2004);
- Nilgiri Mountain Railway (2005);
- Kalka–Shimla Railway (2008).

Why did the British build railways in India?
The British built Indian railways mainly to move raw cotton, grain and troops cheaply and to open the interior to British manufactures, and they financed it by guaranteeing private investors a fixed return.
How the 1849 guarantee worked
Under the old guarantee contracts signed by the East India Company in 1849 with the East Indian Railway and the GIPR, companies got four things:
- the right to raise money in London;
- free land on long leases;
- about 5% a year on their capital, paid from Indian revenues if the line earned less;
- the right to hand the line back for compensation.
A guaranteed return rewards spending rather than efficiency, which is why historians often describe the scheme as private enterprise at public risk.
The guarantee worked as a growth engine. By 1880 the network was about 9,000 miles (around 14,500 km).
In 1871 the government adopted metre gauge as a cheaper second standard alongside the 5 ft 6 in broad gauge, which is the story I tell in why India runs on 1,676 mm broad gauge. In 1879 the government used its option to buy the East Indian Railway but left the company to run it, a pattern of state ownership and company operation that lasted into the twentieth century.
Donaldson assembled colonial district-level data on prices, output and trade from 1870 to 1930 and used a general-equilibrium trade model to measure what the railways did. Rail access lowered trade costs and price gaps between regions, raised internal and external trade, and raised real agricultural income by about 16% in the average district it reached. The model's welfare measure explains almost all of that income effect. As a placebo test he used over 40,000 km of lines that were approved but never built, and found no spurious gains along them. Limit: it measures gains from trade, not who captured them, and colonial farm incomes stayed highly exposed to the monsoon.
Read the paper (free)A preliminary analysis of colonial districts asking whether rail-driven trade softened famine. Before a district was connected, rainfall shortfalls had large effects on famine intensity and mortality; once the railway arrived, mortality became significantly less responsive to bad rain, because food could be shipped in and local prices no longer spiked as far. Limit: the authors present it as early evidence, and railways also let grain flow out of deficit regions when prices elsewhere were higher.
Read the paper (free)How did the network grow from 1853 to today?
Route length grew from about 53,600 km in 1950-51 (MoSPI) to about 69,400 km in 2024-25 (Economic Survey 2025-26), but the bigger change was in traction: electrified route length went from 388 km to 68,700 km over the same period.
The first electric train ran on 3 February 1925 between Victoria Terminus and Kurla on the Harbour line, a 16 km stretch on 1,500 V DC, making India among the first Asian countries with electric railways. Electrification then crawled for decades; PIB says only about 21,801 route km were electric in 2014, against 69,873 of 70,142 broad-gauge route km (99.6%) by March 2026.
See the data as a table
| Total route km (km) | Electrified route km (km) | |
|---|---|---|
| 1950-51 | 53596 | 388 |
| 1960-61 | 56247 | 748 |
| 1970-71 | 59790 | 3706 |
| 1980-81 | 61240 | 5345 |
| 1990-91 | 62367 | 9968 |
| 2000-01 | 63028 | 14856 |
| 2010-11 | 64460 | 19607 |
| 2020-21 | 68100 | 44800 |
| 2023-24 | 69180 | 62250 |
| 2024-25 | 69440 | 68700 |
Source: MoSPI Statistical Year Book (Railways chapter) for 1950-51 to 2010-11; Economic Survey 2025-26 Statistical Appendix, Table 1.26 for 2020-21 to 2024-25 · 2020-21 onwards are rounded to the nearest 10 km from thousands in the Economic Survey.
The flat line for total route length hides real work. Some route km disappeared as narrow and metre gauge lines closed or were converted, while new lines opened, so the net figure moved slowly. The steep electrification curve after 2014 reflects a deliberate decision to stop buying diesel for trunk routes; PIB credits it with saving about 180 crore litres of diesel in 2024-25.
The milestones, in one table
| Date | Milestone |
|---|---|
| 1849 | East India Company signs guarantee contracts with the East Indian Railway and the GIPR |
| 16 April 1853 | First passenger train, Bori Bunder to Thane, about 34 km |
| 1871 | Metre gauge adopted as a second standard |
| 1881 | Darjeeling Himalayan Railway opens (UNESCO World Heritage Site, 1999) |
| 1895 | First steam locomotive built in India, F-734, at the Ajmer workshop |
| 3 February 1925 | First electric train, Victoria Terminus to Kurla, 1,500 V DC |
| 1879 | Government buys the East Indian Railway, leaving the company to operate it |
| 1947–1952 | 42 railway systems merged; regrouped into six zones |
| 1 March 1969 | First Rajdhani Express, New Delhi to Howrah |
| 1986 | Computerised Passenger Reservation System (PRS) begins; CRIS founded |
| 1985 onwards | Steam phased out of main-line service |
| February 2019 | Vande Bharat Express launched |
| 17 January 2026 | First Vande Bharat Sleeper flagged off, Howrah–Kamakhya |
| March 2026 | 99.6% of 70,142 broad-gauge route km electrified |
What changed after Independence?
After 1947, Indian Railways was formed by merging 42 separate railway systems, including lines owned by former princely states, and by 1952 they had been regrouped into six administrative zones. Zones turned a patchwork of company and princely-state lines into a single national operator, with uniform rules, rolling stock and accounts. The structure has since been split further; MoSPI's statistical year book counted 17 zones, including Metro Railway Kolkata, and 68 operating divisions in 2011.
Rajdhani and the computerised reservation
Two later changes transformed the passenger experience. The first Rajdhani Express left New Delhi for Howrah on 1 March 1969 as a twice-weekly air-conditioned train covering 1,441 km in under 18 hours, the first Indian train sold on speed. Then in 1986 the Passenger Reservation System replaced handwritten charts at counters, and the Centre for Railway Information Systems (CRIS) was set up the same year. Every modern booking feature, from the Tatkal quota to the RailOne app launched in July 2025, sits on that system.

Why did steam last until the 1990s?
Steam lasted because India had cheap coal, cheap labour and a huge fleet of working engines, and because electrification and diesel needed capital the railway did not have. PIB dates the gradual phase-out from 1985, and steam now survives mainly on heritage lines such as the Darjeeling Himalayan Railway and the Nilgiri Mountain Railway, both UNESCO-listed. The economics flipped once fuel and maintenance costs were counted: PIB says electric traction is about 70% cheaper to run than diesel, and electrification saved roughly ₹6,000 crore in fuel.
What does Indian Railways look like in 2026?
In 2026 the network is almost fully electric, faster on paper and gradually safer. PIB reports:
- track fit for 110 km/h or more grew from 31,445 km (40% of the network) in 2014 to over 85,000 km (over 80%) by February 2026;
- the Kavach automatic train protection system is live on over 3,100 route km, with 24,400 km more under way;
- 1,674 locomotives were built in 2025-26.
Vande Bharat trains, launched in February 2019 as India's first indigenously designed semi-high-speed trainsets, carried about 3.98 crore passengers in 2025-26.
From 400 holiday passengers in 1853 to 741 crore journeys in a single year.Both figures from PIB, From Steam to Speed (April 2026)
Speed and punctuality still lag the headlines, which I measure in how late Indian trains really run. The next step change is the 508 km Mumbai–Ahmedabad high-speed line, designed for 320 km/h, and the record ₹2,78,000 crore capital outlay in the 2026–27 Union Budget.
The government's official history and status note for Rail Day 2026. It gives the 1853 first-run details (about 400 passengers, 14 carriages, the locomotive Falkland, 21-gun salute), the 1871 metre gauge decision, the 1881 Darjeeling line, the 1895 Ajmer locomotive, the 1925 electrification, the merger of 42 systems and the 1952 six-zone structure, and current numbers: 99.6% of 70,142 broad-gauge route km electrified, 741 crore passengers and 1,670 million tonnes of freight in 2025–26, Kavach on over 3,100 route km. Limit: it is a government publication, so it reports achievements and not shortfalls such as punctuality or accident data.
Read the paper (free)
What's new
- First Vande Bharat Sleeper flagged off on the 972 km Howrah–Kamakhya route The Week, Jan 2026
- PIB: 99.6% of broad gauge electrified and 741 crore passengers in 2025-26 Press Information Bureau, Apr 2026
- Bengaluru–Mumbai Vande Bharat Sleeper flagged off, the first in South India Deccan Chronicle, Nov 2026
- Mumbai marks 100 years of electric trains since the 1925 CSMT–Kurla run Free Press Journal, Feb 2025
Related reading: India's busiest railway stations, how railway timekeeping led to IST, and the Kyun page for more of these questions.
Questions people ask
When did the first train run in India?
On 16 April 1853, from Bori Bunder in Bombay to Thane, about 34 km. The Great Indian Peninsula Railway ran it with 14 carriages and about 400 passengers, and Bombay declared the day a public holiday.
Why did the British build railways in India?
To move cotton, grain and troops cheaply and to open inland markets, financed by private companies that the East India Company guaranteed about 5% a year from 1849. Research by Dave Donaldson shows the lines also raised real farm incomes by about 16% where they reached, by cutting trade costs.
Who was the first to bring railways to India?
Lord Dalhousie, then Governor-General, is usually credited with pushing the trunk-line plan and a single gauge in his Railway Minute of 1850, and the first contracts were signed in 1849 with the East Indian Railway and the GIPR. The GIPR ran the first passenger train in 1853.
When was Indian Railways fully electrified?
Not fully yet: by March 2026, 69,873 of 70,142 broad-gauge route km (99.6%) were electrified, up from 388 km in 1950-51 and 21,801 km in 2014, according to PIB.
Sources
- Press Information Bureau: From Steam to Speed, the Ever-Evolving Journey of Railways (April 2026; first train details, zones, electrification and 2025-26 figures)
- MoSPI Statistical Year Book: Railways chapter (route km and electrified km, 1950-51 to 2010-11)
- Economic Survey 2025-26, Statistical Appendix Table 1.26: Operations of Indian Railways (route km 2020-21 to 2025-26)
- Donaldson: Railroads of the Raj, NBER w16487 / AER 2018
- Burgess and Donaldson: Can Openness Mitigate the Effects of Weather Shocks? (AER P&P 2010)
- Business Standard, Bibek Debroy: A 1924 legacy (2016; guarantee contracts of 1849)
- IRFCA: Indian Railways repeal proposals, background (5% guarantee, land and 99-year terms)
- Free Press Journal: First EMU ran between CSMT and Kurla on 3 February 1925 (2025)
- RailPost: The Rajdhani class of trains, a chronology from 1969
- Press Information Bureau: Passenger Reservation System and CRIS, 1986 (2026)
- The Week: First Vande Bharat Sleeper flagged off (2026)
